Skip to content
Tech

Vietnam Song Bung 2 Hydropower Project Tunnel Construction Progress

News Vietnam Editorial team · AI-written, reviewed under our editorial standards · · Reading time 7min read · Views 0 ·
Key — Vietnam Song Bung 2 Hydropower Project tunnel construction progresses in West Da Nang. The project features a 9,300 meter main tunnel.

The Song Bung 2 Hydropower Project is currently under construction in the mountainous region of West Da Nang. This major infrastructure development features a main water conveyance tunnel with a length of approximately 9,300 meters. This tunnel serves as a critical component of the energy transmission line, transporting water from the reservoir to the power plant. The project is situated in an area where the mountain height reaches 220 meters. The project is part of a larger energy infrastructure development in Central Vietnam.

Tunnel Construction Details

The main water conveyance tunnel has a length reported as 9,299 meters by the Vietnam Energy Magazine. This tunnel is a critical component of the energy transmission line, transporting water from the reservoir to the power plant. Approximately 6 kilometers of the tunnel currently lack construction access shafts. The tunnel has a small diameter, which makes conventional blasting methods unsafe for construction workers. The tunnel passes through complex terrain, including faults, landslides, and groundwater formations that require specialized engineering solutions.

Project Investment and Scope

The project has a total investment value of 5,200 billion Vietnamese Dong. This total investment covers the entire scope of the hydropower development. The project involves the construction of 1,680 two-story attached houses, schools, and parks for local residents. The project has a total investment value of over 2,000 billion Vietnamese Dong for residential and infrastructure components. This development is expected to benefit thousands of local residents living in the mountainous region.

Construction Timeline and Environment

Construction of tunnel sections 3 and 4, totaling 3,700 meters in length, took approximately 3 years to complete. The project is situated in a region where the summer temperature is 3-4 degrees Celsius cooler than Hanoi. This cooler climate contrasts with the warmer conditions experienced in the capital city. The project area covers 26 hectares for the residential and infrastructure components. The development aims to provide essential services and housing for the local community.

The project is located in a region where the mountain height reaches 220 meters. This elevation contributes to the cooler summer temperatures experienced in the area. The development includes the construction of 1,680 two-story attached houses, schools, and parks. These facilities are designed to support the local population benefiting from the energy infrastructure development. The project represents a significant investment in regional energy and social infrastructure.

Glossary

  • reservoir — The reservoir is a component of the energy transmission line. It transports water to the power plant.
  • power plant — The power plant is a destination for water transported from the reservoir. It is part of the energy transmission line.
  • Vietnamese Dong — The Vietnamese Dong is a currency unit. It has been replaced with polymer banknotes for denominations of 10,000₫ and above since 2003.

This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact

How did you like this post?

Comments 0

Be the first to comment

Contact us

← News Vietnam Home
News Vietnam Get new posts by emailSubscribe to receive new content via email. Unsubscribe anytime.
Was this helpful?Share it with friends & social