Ho Chi Minh City opens 3 sluice gates of 10,000 billion VND flood control project to public
Ho Chi Minh City will open 3 sluice gates of the 10,000 billion VND flood control project to the public on November 27 and 28, 2026. The project, officially named the project to solve tidal flooding in Ho Chi Minh City considering climate change - phase 1, includes 8 tidal control sluices, approximately 6km of embankments and protective revetments, and 41 small sluices. The 8 tidal control sluices are Bến Nghé, Tân Thuận, Phú Xuân, Mương Chuối, Cây Khô, Phú Định, Cầu Kinh, and Bà Bướm.
Project scope and area
The project will operate 19 monitoring points combined with an automatic SCADA control and continuous monitoring system. The project helps control tidal flooding for an area of approximately 570km2, benefiting about 6.5 million people, mainly in the central and southern parts of Ho Chi Minh City, on the right bank of the Saigon River. The project area covers 20 wards and communes, including Sài Gòn, Tân Định, Bến Thành, Cầu Ông Lãnh, Xóm Chiếu, Khánh Hội, Vĩnh Hội, Tân Thuận, Phú Thuận, Tân Mỹ, Tân Hưng, Chánh Hưng, Phú Định, Bình Đông, Nhà Bè, Hiệp Phước, Tân Nhựt, Bình Chánh, Hưng Long, and Bình Hưng.
These areas were previously located in districts 1, 4, 7, 8, and communes Nhà Bè and Bình Chánh. The primary role of the project is to form a system of structures to control tidal surges from large rivers entering the urban canal and ditch system. When operating synchronously, the sluice gates and embankments will help limit high tides causing flooding in residential areas, roads, and infrastructure.
System functions and operation
Besides tidal control, the system also supports water level regulation in canals and ditches, facilitating the reception and drainage of rainwater through the existing urban drainage system. The project is part of the Ho Chi Minh City flood control system, which has been operating continuously since the beginning of the year. media reports state that the metro project will be completed in the next month and may receive up to 830,000 visitors per day.
Public viewing program
The public viewing program will take place on November 27 and 28, 2026, at the Bến Nghé, Tân Thuận, and Mương Chuối sluices. Each visitor must register for one structure, one time slot, and one visit using their CCCD. The registration portal is currently open for the public.
Glossary
- VND — The project, officially named the project to solve tidal flooding in Ho Chi Minh City considering climate change - phase 1, includes 8 tidal control sluices, approximately 6km of embankments and protective revetments, and 41 small sluices.
- Saigon River — The project helps control tidal flooding for an area of approximately 570km2, benefiting about 6.5 million people, mainly in the central and southern parts of Ho Chi Minh City, on the right bank of the Saigon River.
- wards — The project area covers 20 wards and communes, including Sài Gòn, Tân Định, Bến Thành, Cầu Ông Lãnh, Xóm Chiếu, Khánh Hội, Vĩnh Hội, Tân Thuận, Phú Thuận, Tân Mỹ, Tân Hưng, Chánh Hưng, Phú Định, Bình Đông, Nhà Bè, Hiệp Phước, Tân Nhựt, Bình Chánh, Hưng Long, and Bình Hưng.
This article was written with AI assistance from multiple news reports and is reviewed by our editors under our editorial principles. Editorial Standards · Tips & Contact
Comments 0